Download AllTenders App for Free!
Enter Mobile to get link to Download the App
AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003428221 |
05-Mar-2024 | To assist loading , Transportation and installation (69LE/17D-16D) of 800 mm belt conveyor drive head (Transportation from W-7) of E-9 Dist . of Bagdona seam at Tawa Mine , Pathakhera Area . ||||To assist loading , Transportation and installation (69LE/17D-16D) of 800 mm belt conveyor drive head (Transportation from W-7) of E-9 Dist . of Bagdona seam at Tawa Mine , Pathakhera Area . | MINING | INDIA | MADHYA PRADESH | 166923 | Details | |
5003404296 |
29-Feb-2024 | Contractual work for making 440 nos . Concrete pillars and fixing for subsidence leveling over proposed depillaring E-1A panel of LWS Chhatarpur mine , no 1 Pathakhera Area||||Contractual work for making 440 nos . Concrete pillars and fixing for subsidence leveling over proposed depillaring E-1A panel of LWS Chhatarpur mine , no 1 Pathakhera Area | MINING | INDIA | MADHYA PRADESH | 102643 | Details | |
5003406639 |
Not Specified | Online electronic bids through Electronic Tendering System (ETS) are invited from Experienced Contractors for loading transportation of crushed Limestone from CCI Manal Limestone Mines crusher to Rajban cement factory||||Online electronic bids through Electronic Tendering System (ETS) are invited from Experienced Contractors for loading transportation of crushed Limestone from CCI Manal Limestone Mines crusher to Rajban cement factory | MINING | INDIA | HIMACHAL PRADESH | Not Specified | Details | |
5003396601 |
Not Specified | HO(Contracts)/NCP - DHCS/DEP-14 -11C / 945||||crushing plant and downhill conveying system of deposit 14 and 11c at bailadila iron ore mine , kirandul complex , Chhattisgarh on Turnkey basis | MINING | INDIA | CHHATTISGARH | Not Specified | Details | |
5003384299 |
Not Specified | Cleaning of Jig tank at OCF jig Balaghat Mine||||Cleaning of Jig tank at OCF jig Balaghat Mine | MINING | INDIA | MADHYA PRADESH | 191389 | Details | |
5003383830 |
24-Feb-2024 | Water Spraying||||Proposal for the work of water spraying in travelling roadways and haulage roadways in LWS at Tawa-II Mine , Pathakhera Area . | MINING | INDIA | MADHYA PRADESH | 199169 | Details | |
5003384823 |
26-Feb-2024 | Construction of retaining wall||||PROPOSAL FOR THE WORK OF CONSTRUCTION OF 04 Nos . RETAINING WALL (03 Nos IN BWS and 01 Nos IN LWS) WITH FLY ASH BRICKS INCLUDING ALL MATERIALS IN LWS and BAGDONA SEAM AT TAWA-II MINE , PATHAKHERA AREA . | MINING | INDIA | MADHYA PRADESH | 182645 | Details | |
5003382773 |
22-Feb-2024 | Contractually Removal of Muck/Silt for Shifting of Pump for Dewatering of W7 Sump of Bagdona Seam at Tawa Mine , Pathakhera Area . ||||Contractually Removal of Muck/Silt for Shifting of Pump for Dewatering of W7 Sump of Bagdona Seam at Tawa Mine , Pathakhera Area . | MINING | INDIA | MADHYA PRADESH | 179015 | Details | |
5003383224 |
23-Feb-2024 | Laying of Track Line||||PROPOSAL FOR THE WORK OF TRANSPORTATION OF HAULAGE TRACK LINE FROM 2DS/3LS TO 51LN/12DN AND LAYING OF HAULAGE TRACK LINE FROM 51LN/12DN TO 51LN/22DN IN 52LN/MD PROPOSED DEPILLARING DISTRICT IN LWS , TAWA-II MINE , PATHAKHERA AREA , WCL | MINING | INDIA | MADHYA PRADESH | 197271 | Details | |
5003358325 |
29-Feb-2024 | Removal of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of Man River at Shahapur Ta Khamgaon Dist Buldhana||||Removal of silt/silt mixed sand from the riverbed for restoration/regularization of river flow of Man River at Shahapur Ta Khamgaon Dist Buldhana | MINING | INDIA | MAHARASHTRA | Not Specified | Details |
Back |
Page 7 of 95 ( 947 records ) |
Next |
.... 2 3 4 5 6 7 8 9 10 11 12 .... |