AllTenders - Serving clients online since Jan, 2000            Sales: 9313852989, 9355399771

franchise

Liaison Support

Tenders that match your criteria


Ref. No. Active Till Name of Work Category Sub Category Country State Estimated Cost (Rs.) Details
5003291652
22-Feb-2024 4laning of Aligarh Palwal Sec from Km . 0 . 00 (Starting from junction of NH-34 Aligarh)to Km . 46 . 390 PKG I from (Khereshwar Junction Kurana)of NH-334D Inclu Khair n Jattari Bypass in UP on HAM||||4laning of Aligarh Palwal Sec from Km . 0 . 00 (Starting from junction of NH-34 Aligarh)to Km . 46 . 390 PKG I from (Khereshwar Junction Kurana)of NH-334D Inclu Khair n Jattari Bypass in UP on HAM INDIA DELHI (U.T.-NCT) 10092800000 Details
5003291543
19-Feb-2024 4 or 6 laning of Karakkunnu to Vazahayoor section of NH 966 from km . 87 . 930 to km . 113 . 000 in the State of Kerala on Hybrid Annuity mode under Bharatmala||||4 or 6 laning of Karakkunnu to Vazahayoor section of NH 966 from km . 87 . 930 to km . 113 . 000 in the State of Kerala on Hybrid Annuity mode under Bharatmala INDIA DELHI (U.T.-NCT) 16270400000 Details
5003291554
19-Feb-2024 RFP for 4/6 laning of Karimba to Edathanattukara section of NH 966 from km . 30 . 720 to km . 61 . 440 in the State of Kerala in HAM mode under Bharatmala Pariyojana . ||||RFP for 4/6 laning of Karimba to Edathanattukara section of NH 966 from km . 30 . 720 to km . 61 . 440 in the State of Kerala in HAM mode under Bharatmala Pariyojana . INDIA DELHI (U.T.-NCT) 11938100000 Details
5003291602
Not Specified Construction of Twin Tube Unidirectional Tunnel||||Construction of Twin Tube Unidirectional Tunnel 2-Lanes in the Kozhikode and Wayanad Districts of Kerala State on EPC Basis incl . Four Lane app . Road for direct Connectivity Between Anakkampoyil Kalladi Meppadi from Km 0 . 460 to Km 8 . 735 PkgII INDIA KERALA 16433300000 Details
5003291630
20-Feb-2024 Construction of Elevated Highway Corridor (6-Lane At-Grade and 6-Lane Elevated Highway) from Km . 34 . 000-Km . 59 . 850 (Section from Pune to Shirur of NH-753F Design Length 25 . 850 Km) in the State of Maharashtra on BOT (Toll) Mode (Package-3) under NH-O||||Construction of Elevated Highway Corridor (6-Lane At-Grade and 6-Lane Elevated Highway) from Km . 34 . 000-Km . 59 . 850 (Section from Pune to Shirur of NH-753F Design Length 25 . 850 Km) in the State of Maharashtra on BOT (Toll) Mode (Package-3) under NH-O INDIA DELHI (U.T.-NCT) 29037400000 Details
5003291590
15-Feb-2024 Development of 4 lane EC from Bowaichandi to Guskara-Katwa Road Sec Km 89 . 814 to Km 133 . 000 of NH 116A (Package3) in the state of West Bengal under Hybrid Annuity Mode . ||||Development of 4 lane EC from Bowaichandi to Guskara-Katwa Road Sec Km 89 . 814 to Km 133 . 000 of NH 116A (Package3) in the state of West Bengal under Hybrid Annuity Mode . INDIA DELHI (U.T.-NCT) 12313200000 Details
5003291570
26-Feb-2024 4L of NH530B from Chandan Nagar(Existing Km96 . 200 of NH530B Design Km . 179 . 500) to Bareilly Bypass(End)(Existing Km267 . 000 of NH30 Design Km227 . 680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4)||||4L of NH530B from Chandan Nagar(Existing Km96 . 200 of NH530B Design Km . 179 . 500) to Bareilly Bypass(End)(Existing Km267 . 000 of NH30 Design Km227 . 680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4) INDIA DELHI (U.T.-NCT) 12035500000 Details
5003275128
Not Specified Execution of Khandwa lift micro irrigation project in Lumpsum for Turnkey contract for irrigation 53330 Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work (But not limited of that)||||Execution of Khandwa lift micro irrigation project in Lumpsum for Turnkey contract for irrigation 53330 Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work (But not limited of that) INDIA MADHYA PRADESH 15449100000 Details
5003275920
Not Specified Package-I Civil Work of Dugar HE Project , 500 MW , Himachal Pradesh , India . ||||Package-I Civil Work of Dugar HE Project , 500 MW , Himachal Pradesh , India . INDIA HIMACHAL PRADESH 20031100000 Details
5003279501
14-Feb-2024 6 Laning of Pune Hyderabad section of NH 65 from km 493 . 000 to 524 . 000 from Sangareddy X roads to Madinaguda excluding BHEL flyover from km 520 . 000 to 521 . 650 in the State of Telangana on EPC Basis||||6 Laning of Pune Hyderabad section of NH 65 from km 493 . 000 to 524 . 000 from Sangareddy X roads to Madinaguda excluding BHEL flyover from km 520 . 000 to 521 . 650 in the State of Telangana on EPC Basis INDIA Telangana 10113400000 Details

Back Page 22 of 69
( 685 records )
Next
....   17    18    19    20    21    22    23    24    25    26    27  ....