Download AllTenders App for Free!
Enter Mobile to get link to Download the App
AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003487824 |
14-Mar-2024 | Engagement of user fee collection agency on the basis of CB through etender for Maigalganj FP at Design Km 372 . 168 for the use of 4 and more lanes section of Bareiily Sitapur Sec of NH number 24 in the State of Uttar Pradesh||||Engagement of user fee collection agency on the basis of CB through etender for Maigalganj FP at Design Km 372 . 168 for the use of 4 and more lanes section of Bareiily Sitapur Sec of NH number 24 in the State of Uttar Pradesh | INDIA | DELHI (U.T.-NCT) | 1145800000 | Details | ||
5003492112 |
Not Specified | DREDGING FOR MAINTENANCE OF CHANNELS AND BASINS AT COCHIN PORT FOR THREE YEARS FROM 2024 25 TO 2026 27||||DREDGING FOR MAINTENANCE OF CHANNELS AND BASINS AT COCHIN PORT FOR THREE YEARS FROM 2024 25 TO 2026 27 | INDIA | KERALA | 3916200000 | Details | ||
5003482442 |
Not Specified | Supply , Installation and Commissioning of 20 CuM Electric Hydraulic Face Shovels along with Consumable Spares and Consumables for warranty period of one year and Spares and Consumables for post warranty period of 7 years under Spares Cost Cap||||Supply , Installation and Commissioning of 20 CuM Electric Hydraulic Face Shovels along with Consumable Spares and Consumables for warranty period of one year and Spares and Consumables for post warranty period of 7 years under Spares Cost Cap | INDIA | WEST BENGAL | 2661600000 | Details | ||
5003484648 |
06-Mar-2024 | Construction of 9 Nos . of Standalone Safety Structures/Works at different Locations on various NHs in the State of Maharashtra on EPC mode . ||||Construction of 9 Nos . of Standalone Safety Structures/Works at different Locations on various NHs in the State of Maharashtra on EPC mode . | INDIA | DELHI (U.T.-NCT) | 2617900000 | Details | ||
5003491065 |
Not Specified | Civil works including Earthwork for Railway formation , Blanketing work , drain works , RE wall between . . Double line . . New BG Electrified Double Railway Line for Chhattisgarh East West Rail Corridor . . from . . in Chhattisgarh over SECR||||Civil works including Earthwork for Railway formation , Blanketing work , drain works , RE wall between . . Double line . . New BG Electrified Double Railway Line for Chhattisgarh East West Rail Corridor . . from . . in Chhattisgarh over SECR | INDIA | CHHATTISGARH | 1178681818 | Details | ||
5003480252 |
Not Specified | Execution of Shaheed Ilap Singh lift micro irrigation projectas Turnkey contract for irrigation in 26890Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work(But not limited to that) . ||||Execution of Shaheed Ilap Singh lift micro irrigation projectas Turnkey contract for irrigation in 26890Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work(But not limited to that) . | INDIA | MADHYA PRADESH | 5252200000 | Details | ||
5003448428 |
Not Specified | Advanced High Energy Linear Accelerator||||Supply , installation and commissioning of Advanced High Energy Linear Accelerator | INDIA | UTTAR PRADESH | 1080000000 | Details | ||
5003448433 |
07-Mar-2024 | 4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode||||4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode | INDIA | DELHI (U.T.-NCT) | 9356600000 | Details | ||
5003447974 |
Not Specified | Transportation of Indane LPG Cylinders in vertical position on unit rate basis ex-Chittoor Bottling Plant | INDIA | DELHI (U.T.-NCT) | 1355100000 | Details | ||
5003452636 |
Not Specified | Design and Construction of Elevated Metro Viaduct of length 17 . 624 km between Ch . 21256 . 814 to Ch . 38881 . 7 including Railway spans of length 79m and 100m and 6-lane Double-Decker Road bridge/flyover of length 1 . 027km on National Highway on integrate||||Design and Construction of Elevated Metro Viaduct of length 17 . 624 km between Ch . 21256 . 814 to Ch . 38881 . 7 including Railway spans of length 79m and 100m and 6-lane Double-Decker Road bridge/flyover of length 1 . 027km on National Highway on integrated P | INDIA | MAHARASHTRA | 10000000000 | Details |
Back |
Page 105 of 577 ( 5767 records ) |
Next |
.... 100 101 102 103 104 105 106 107 108 109 110 .... |