Download AllTenders App for Free!
Enter Mobile to get link to Download the App

AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003492112 |
Not Specified | DREDGING FOR MAINTENANCE OF CHANNELS AND BASINS AT COCHIN PORT FOR THREE YEARS FROM 2024 25 TO 2026 27||||DREDGING FOR MAINTENANCE OF CHANNELS AND BASINS AT COCHIN PORT FOR THREE YEARS FROM 2024 25 TO 2026 27 | INDIA | KERALA | 3916200000 | Details | ||
5003480252 |
Not Specified | Execution of Shaheed Ilap Singh lift micro irrigation projectas Turnkey contract for irrigation in 26890Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work(But not limited to that) . ||||Execution of Shaheed Ilap Singh lift micro irrigation projectas Turnkey contract for irrigation in 26890Ha . Up to 2 . 5 Ha . Chak as per detailed scope of work(But not limited to that) . | INDIA | MADHYA PRADESH | 5252200000 | Details | ||
5003484162 |
Not Specified | Rehabilitation and Up-gradation of Injegaon (Dhamoni) to Pohner Phata (Design Ch . 0/00 to 25/500) section of NH 548B to two/four lane with paved shoulder on EPC mode in the State of Maharashtra||||Rehabilitation and Up-gradation of Injegaon (Dhamoni) to Pohner Phata (Design Ch . 0/00 to 25/500) section of NH 548B to two/four lane with paved shoulder on EPC mode in the State of Maharashtra . | INDIA | MAHARASHTRA | 1999810211 | Details | ||
5003479908 |
Not Specified | Engagement of an Agency (SI) for Design , Engineering , manufacture , Supply , wiring , Installation , Testing and Commissioning of Hardware and Software for implementation and support of the Substation-Consolidation , Data Acquisition and Control (SDAC)||||Engagement of an Agency (SI) for Design , Engineering , manufacture , Supply , wiring , Installation , Testing and Commissioning of Hardware and Software for implementation and support of the Substation-Consolidation , Data Acquisition and Control (SDAC) | INDIA | MADHYA PRADESH | 1700000000 | Details | ||
5003484651 |
06-Mar-2024 | Construction of 07 Nos of Standalone safety structures/works at different locations on NH-3 in the state of Maharashtra on EPC Mode . ||||Construction of 07 Nos of Standalone safety structures/works at different locations on NH-3 in the state of Maharashtra on EPC Mode . | INDIA | DELHI (U.T.-NCT) | 1945530000 | Details | ||
5003448436 |
07-Mar-2024 | Construction of 4L from Amjhar Road to Barela (Jabalpur Ring Road Pkg 5) from design km 98 . 950 (Near Amjhar) to km 113 . 925 and km 0 . 000 to Km 2 . 900 (Near Barela) (Total design Length 17 . 875 km) under NH(O) in Madhya Pradesh on HAM||||Construction of 4L from Amjhar Road to Barela (Jabalpur Ring Road Pkg 5) from design km 98 . 950 (Near Amjhar) to km 113 . 925 and km 0 . 000 to Km 2 . 900 (Near Barela) (Total design Length 17 . 875 km) under NH(O) in Madhya Pradesh on HAM | INDIA | DELHI (U.T.-NCT) | 4425700000 | Details | ||
5003448457 |
14-Mar-2024 | Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km . 105 . 700 to Km . 106 . 800) on NH25 (New NH27) and Interchange at Km . 97 . 100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode||||Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km . 105 . 700 to Km . 106 . 800) on NH25 (New NH27) and Interchange at Km . 97 . 100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode | INDIA | DELHI (U.T.-NCT) | 1440200000 | Details | ||
5003448428 |
Not Specified | Advanced High Energy Linear Accelerator||||Supply , installation and commissioning of Advanced High Energy Linear Accelerator | INDIA | UTTAR PRADESH | 1080000000 | Details | ||
5003452636 |
Not Specified | Design and Construction of Elevated Metro Viaduct of length 17 . 624 km between Ch . 21256 . 814 to Ch . 38881 . 7 including Railway spans of length 79m and 100m and 6-lane Double-Decker Road bridge/flyover of length 1 . 027km on National Highway on integrate||||Design and Construction of Elevated Metro Viaduct of length 17 . 624 km between Ch . 21256 . 814 to Ch . 38881 . 7 including Railway spans of length 79m and 100m and 6-lane Double-Decker Road bridge/flyover of length 1 . 027km on National Highway on integrated P | INDIA | MAHARASHTRA | 10000000000 | Details | ||
5003448433 |
07-Mar-2024 | 4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode||||4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode | INDIA | DELHI (U.T.-NCT) | 9356600000 | Details |
Back |
Page 108 of 580 ( 5796 records ) |
Next |
.... 103 104 105 106 107 108 109 110 111 112 113 .... |