Download AllTenders App for Free!
Enter Mobile to get link to Download the App

AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003396971 |
Not Specified | Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km . 108 . 000 to Km . 250 . 000 in the State of Gujarat on EPC Mode||||Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km . 108 . 000 to Km . 250 . 000 in the State of Gujarat on EPC Mode | INDIA | DELHI (U.T.-NCT) | 8595300000 | Details | ||
5003397113 |
27-Feb-2024 | Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102 . 000 to design km 142 . 357 (Design length 40 . 357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode||||Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102 . 000 to design km 142 . 357 (Design length 40 . 357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode | INDIA | DELHI (U.T.-NCT) | 6136200000 | Details | ||
5003397174 |
28-Feb-2024 | Four Lane with Paved Shoulders from Design Ch . 43 . 800 to Design Ch . 89 . 900 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM Under NH(O) (Project Length 46 . 100 kms) (Package 2)||||Four Lane with Paved Shoulders from Design Ch . 43 . 800 to Design Ch . 89 . 900 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM Under NH(O) (Project Length 46 . 100 kms) (Package 2) | INDIA | DELHI (U.T.-NCT) | 8503700000 | Details | ||
5003397169 |
29-Feb-2024 | Const of 6lane Eastern Ring Road around Indore City from km 90 . 000 to Km 119 . 700 (PkgII)(length-29 . 7 km) in Madhya Pradesh on HAM . ||||Const of 6lane Eastern Ring Road around Indore City from km 90 . 000 to Km 119 . 700 (PkgII)(length-29 . 7 km) in Madhya Pradesh on HAM . | INDIA | DELHI (U.T.-NCT) | 9086700000 | Details | ||
5003398109 |
Not Specified | Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod , Bhojlawa , Hadota , Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode||||Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod , Bhojlawa , Hadota , Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode | INDIA | RAJASTHAN | 1932700000 | Details | ||
5003396419 |
Not Specified | Up Gradation to Two Four lane with paved shoulder configuration of NH 652 from Tuljapur Naldurge Akkalkot road Chainage from Km 00 . 000 to Km 30 . 982 in the state of Maharashtra on EPC Mode Length 30 . 982Km||||Up Gradation to Two Four lane with paved shoulder configuration of NH 652 from Tuljapur Naldurge Akkalkot road Chainage from Km 00 . 000 to Km 30 . 982 in the state of Maharashtra on EPC Mode Length 30 . 982Km | INDIA | MAHARASHTRA | 1363400000 | Details | ||
5003397022 |
26-Feb-2024 | Development of 4 lane Economic Corridor from Kharagpur to Chandrakona Ghatal Road Crossing sec Km0 . 000 to Km 41 . 000 of NH 116A (PKG I) in the state of West Bengal under HAM Mode . ||||Development of 4 lane Economic Corridor from Kharagpur to Chandrakona Ghatal Road Crossing sec Km0 . 000 to Km 41 . 000 of NH 116A (PKG I) in the state of West Bengal under HAM Mode . | INDIA | DELHI (U.T.-NCT) | 9848600000 | Details | ||
5003393954 |
Not Specified | Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design length 19 . 20 Km in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM)||||Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design length 19 . 20 Km in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM) | INDIA | MADHYA PRADESH | 4349800000 | Details | ||
5003393607 |
Not Specified | Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54 . 000 to 82 . 300 and Design chainage km 54 . 000 to 82 . 120 Shikrapur to Nhavara Section to 2L PS . 4L Configuration in the State of Maharashtra on||||Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54 . 000 to 82 . 300 and Design chainage km 54 . 000 to 82 . 120 Shikrapur to Nhavara Section to 2L PS . 4L Configuration in the State of Maharashtra on | INDIA | MAHARASHTRA | 2767962992 | Details | ||
5003379887 |
12-Mar-2024 | DRILLING , EXCAVATION , LOADING , TRANSPORTATION , DUMPING , SPREADING & LEVELLING , ETC . , OF 602 . 58 LBCM OF IN-SITU OB (WHICH INCLUDES 4 . 08 LBCM of TOP SOIL , 569 . 92 LBCM OF HARD OB & 28 . 58 LBCM OF COAL) AND RE-HANDLING OF 15 . 28 LCM OF TOP SOIL WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ . , 3 , 000 RMT OF DRILLING AT RG OCP-III MINE (PHASE-II) , RG-II AREA DURING A PERIOD OF 36 MONTHS . | INDIA | Telangana | 3858700000 | Details |
Back |
Page 131 of 580 ( 5796 records ) |
Next |
.... 126 127 128 129 130 131 132 133 134 135 136 .... |