Download AllTenders App for Free!
Enter Mobile to get link to Download the App
AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003585262 |
Not Specified | NHIDCL/ Assam/S-D/P-1/2024||||Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder (Package-I) of Srirampur - Dhubri Section of NH-127Bon EPC Mode in the State of Assam | INDIA | ASSAM | 3784500000 | Details | ||
5003580659 |
Not Specified | Selection of SI for STAR 3 . 0 scheme including development of software , supply of hardware , connectivity and supply of man power||||Selection of SI for STAR 3 . 0 scheme including development of software , supply of hardware , connectivity and supply of man power | INDIA | TAMIL NADU | 3234500000 | Details | ||
5003583137 |
Not Specified | System Improvements And Augmentation To SCADA- Automation For Navi Mumbai water supply Scheme Under Amrut 2 . 0 Mission||||System Improvements And Augmentation To SCADA- Automation For Navi Mumbai water supply Scheme Under Amrut 2 . 0 Mission | INDIA | MAHARASHTRA | 1105342206 | Details | ||
5003586331 |
21-Mar-2024 | 4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode||||4Laning of Ahmednagar Solapur Dist Border to Tembhurni sec of NH-561A from Ch . 80 . 390 to Ch . 139 . 609 in the State of Maharashtra to be executed on BOT (Toll) mode | INDIA | DELHI (U.T.-NCT) | 9356600000 | Details | ||
5003583353 |
Not Specified | Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 154/000 to Km 187/99 (Design Length - 33 . 99 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh||||Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 154/000 to Km 187/99 (Design Length - 33 . 99 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh | INDIA | MADHYA PRADESH | 1625089182 | Details | ||
5003582806 |
Not Specified | DEVELOPMENT OF DRY DOCK AND SHIP REPAIR YARD IN PLACE OF EXISTING BARGE JETTIES AT MORMUGAO PORT ON DBFOT BASIS||||DEVELOPMENT OF DRY DOCK AND SHIP REPAIR YARD IN PLACE OF EXISTING BARGE JETTIES AT MORMUGAO PORT ON DBFOT BASIS | INDIA | GOA | 9840000000 | Details | ||
5003584860 |
29-Apr-2024 | Construction of road from km 87 . 13 to Km 121 . 541 (package-3) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh||||Construction of road from km 87 . 13 to Km 121 . 541 (package-3) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh | INDIA | ARUNACHAL PRADESH | 4774919845 | Details | ||
5003582415 |
Not Specified | Rehabilitation and upgradation of NH 166A to two lane paved shoulder from km 2 . 320 to km 3 . 600 and Km 6 . 520 to km 8 . 610 and from Km 14 . 070 to km 14 . 470 of Vadhkal Alibag road (including construction of Major Bridge Flyover VUP) for design length 3 . 77||||Rehabilitation and upgradation of NH 166A to two lane paved shoulder from km 2 . 320 to km 3 . 600 and Km 6 . 520 to km 8 . 610 and from Km 14 . 070 to km 14 . 470 of Vadhkal Alibag road (including construction of Major Bridge Flyover VUP) for design length 3 . 77 | INDIA | MAHARASHTRA | 1782900000 | Details | ||
5003584874 |
01-May-2024 | Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujrat on Hybrid Annuity Mode . ||||Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujrat on Hybrid Annuity Mode . | INDIA | DELHI (U.T.-NCT) | 8832400000 | Details | ||
5003582336 |
25-Apr-2024 | Construction of new Circular Bypass for Nagaur District from Existing amarpura at old NH65 new NH 58 to gogelao on NH 62 on EPC Mode in the state of Rajasthan||||Construction of new Circular Bypass for Nagaur District from Existing amarpura at old NH65 new NH 58 to gogelao on NH 62 on EPC Mode in the state of Rajasthan | INDIA | RAJASTHAN | 2844200000 | Details |
Back |
Page 62 of 577 ( 5767 records ) |
Next |
.... 57 58 59 60 61 62 63 64 65 66 67 .... |