Download AllTenders App for Free!
Enter Mobile to get link to Download the App
AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003532538 |
Not Specified | Palamu Pipeline Irrigation Scheme (Package-I) on Turn Key basis with 10 (Ten) years Operation , Maintenance and Management (OMM) (complete job)||||Palamu Pipeline Irrigation Scheme (Package-I) on Turn Key basis with 10 (Ten) years Operation , Maintenance and Management (OMM) (complete job) | INDIA | JHARKHAND | 1907925302 | Details | ||
5003535275 |
14-Mar-2024 | Engagement of user fee agency through E-Tender at Bharthana FP at design KM 157 . 750 for Six laning of km 108 . 700 to km 192 . 000 of Vadodara-Bharuch Section of NH-8 on BOT Basis in the state of Gujarat||||Engagement of user fee agency through E-Tender at Bharthana FP at design KM 157 . 750 for Six laning of km 108 . 700 to km 192 . 000 of Vadodara-Bharuch Section of NH-8 on BOT Basis in the state of Gujarat | INDIA | DELHI (U.T.-NCT) | 4777900000 | Details | ||
5003533160 |
26-Mar-2024 | Design , Supply , Installation , Testing and Commissioning of Integrated Tunnel Communication including Railway General Telecommunication arrangement in Sivok Rangpo New BG Rail Line project of NF Railway||||Design , Supply , Installation , Testing and Commissioning of Integrated Tunnel Communication including Railway General Telecommunication arrangement in Sivok Rangpo New BG Rail Line project of NF Railway | INDIA | WEST BENGAL | 1561279093 | Details | ||
5003535515 |
21-Mar-2024 | Engagement of user fee collection agency on the basis of CB through e-tender for Hebbalu FP at Km . 237 . 650 for the section of Doddasiddanahally to Hadadi from Km . 189 . 000 to Km . 260 . 000 in Karnataka||||Engagement of user fee collection agency on the basis of CB through e-tender for Hebbalu FP at Km . 237 . 650 for the section of Doddasiddanahally to Hadadi from Km . 189 . 000 to Km . 260 . 000 in Karnataka | INDIA | DELHI (U.T.-NCT) | 1354900000 | Details | ||
5003534358 |
Not Specified | Long term remedial measures for Elimination of Black Spots ID TN(02)-441 , TN(03)-08 , TN-028 , TN-(02)-308 at isolated locations from Chengalpattu (Km51 . 000) Tindivanam (Km121 . 000) section of NH-45 (New NH-32) in the state of Tamil Nadu on EPC Mode||||Long term remedial measures for Elimination of Black Spots ID TN(02)-441 , TN(03)-08 , TN-028 , TN-(02)-308 at isolated locations from Chengalpattu (Km51 . 000) Tindivanam (Km121 . 000) section of NH-45 (New NH-32) in the state of Tamil Nadu on EPC Mode | INDIA | TAMIL NADU | 1166700000 | Details | ||
5003533383 |
Not Specified | CONSTRUCTION OF PIPE DISTRIBUTION NETWORK (PDN) SYSTEM||||CONSTRUCTION OF PIPE DISTRIBUTION NETWORK PDN SYSTEM FOR DY NO 1 INCLUDING MINORS SUB MINORS FORMATION OF WUA RUNNING AND MAINTENANCE FOR FIVE YEARS | INDIA | MAHARASHTRA | 1212413891 | Details | ||
5003533226 |
13-Mar-2024 | Construction of 07 Nos of Standalone safety structures/works at different locations on NH-3 in the state of Maharashtra on EPC Mode . ||||Construction of 07 Nos of Standalone safety structures/works at different locations on NH-3 in the state of Maharashtra on EPC Mode . | INDIA | DELHI (U.T.-NCT) | 1945530000 | Details | ||
5003532113 |
Not Specified | Extended Tembhu Scheme Man Khatav Lift Irrigation Scheme Construction of Cross Regulator Approach Channel Pump House Rising Main Delivery Chamber Man Khatav Gravity Main and their Distribution System through Pipeline Distribution Network Including||||Extended Tembhu Scheme Man Khatav Lift Irrigation Scheme Construction of Cross Regulator Approach Channel Pump House Rising Main Delivery Chamber Man Khatav Gravity Main and their Distribution System through Pipeline Distribution Network | INDIA | MAHARASHTRA | 5386576017 | Details | ||
5003533174 |
Not Specified | Construction of Flyover at Kawas Patiya at Km14 . 400 and VUP at Reliance at Km11 . 220 on NH53 of Surat Hazira section in Gujarat on EPC Mode||||Construction of Flyover at Kawas Patiya at Km14 . 400 and VUP at Reliance at Km11 . 220 on NH53 of Surat Hazira section in Gujarat on EPC Mode | INDIA | DELHI (U.T.-NCT) | 1221200000 | Details | ||
5003534842 |
Not Specified | Construction of Cement Concrete Roads divider pathway||||Construction of Cement Concrete Roads divider pathway Drains of DP Roads under Maharashtra Suvarana Jayanti Nagarotthan Mahabhiyan Yojana in Municipal Corporation Ahmadnagar | INDIA | MAHARASHTRA | 1250437540 | Details |
Back |
Page 85 of 577 ( 5767 records ) |
Next |
.... 80 81 82 83 84 85 86 87 88 89 90 .... |