Download AllTenders App for Free!
Enter Mobile to get link to Download the App
AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5002143364 |
Not Specified | 1151/MPMRCL/2023/Package BH_05 Part Design and Construction of elevated Viaduct between||||Part Design and Construction of elevated Viaduct thirteen 13 elevated Metro Rail Stations viz Bhadbhada Chauraha Depot Chauraha Jawahar Chowk Roshanpura Chauraha Kushabhau Thakre Hall Parade Ground Prabhat Chauraha Govindpura Govindpura | INDIA | MADHYA PRADESH | 11216357602 | Details | ||
5002142908 |
17-Oct-2023 | Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch . 0 . 000 to Garhani (at SH-12) at Ch 74 . 432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of Bihar on HAM Mode||||Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch . 0 . 000 to Garhani (at SH-12) at Ch 74 . 432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of Bihar on HAM Mode | INDIA | DELHI (U.T.-NCT) | 11433600000 | Details | ||
5002143243 |
19-Oct-2023 | 4L of NH530B from Chandan Nagar(Existing Km96 . 200 of NH530B Design Km . 179 . 500) to Bareilly Bypass(End)(Existing Km267 . 000 of NH30 Design Km227 . 680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4)||||4L of NH530B from Chandan Nagar(Existing Km96 . 200 of NH530B Design Km . 179 . 500) to Bareilly Bypass(End)(Existing Km267 . 000 of NH30 Design Km227 . 680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4) | INDIA | DELHI (U.T.-NCT) | 12035500000 | Details | ||
5002144994 |
19-Oct-2023 | Construction of new 6 lane Capital Region Ring Road from Rameswar(NH-16) to Gobindpur (NH-55) package-I from Km . 0 . 000 to Km . 40 . 700 in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode . ||||Construction of new 6 lane Capital Region Ring Road from Rameswar(NH-16) to Gobindpur (NH-55) package-I from Km . 0 . 000 to Km . 40 . 700 in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode . | INDIA | DELHI (U.T.-NCT) | 13789500000 | Details | ||
5002136974 |
Not Specified | RFP For Development and Operation/maintenance of International Film City in Sector 21 , Yamuna Expressway Industrial Development Area(Phase-1) , Uttar Pradesh , INDIA . ||||RFP For Development and Operation/maintenance of International Film City in Sector 21 , Yamuna Expressway Industrial Development Area(Phase-1) , Uttar Pradesh , INDIA . | INDIA | UTTAR PRADESH | 15100000000 | Details | ||
5002144109 |
Not Specified | Construction of 6 lane H . L . /Extra-dosed Cable Bridge on River Ganga parallel to Western side (180 meter upstream) of Digha- Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC mode||||Construction of 6 lane H . L . /Extra-dosed Cable Bridge on River Ganga parallel to Western side (180 meter upstream) of Digha- Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC mode | INDIA | DELHI (U.T.-NCT) | 26358900000 | Details | ||
5002128573 |
Not Specified | Upgradation To Two Lane Four lane With Paved Shoulders of Newly Declared NH 440 Vempalli to Chagalamarri Via Yerraguntla and Proddatur Design Ch from Km 55 . 00 to Km 106 . 52 And Km 109 . 65 to Km . 137 . 08 Design length 78 . 95 Km in the state of AP2022 23||||Upgradation To Two Lane Four lane With Paved Shoulders of Newly Declared NH 440 Vempalli to Chagalamarri Via Yerraguntla and Proddatur Design Ch from Km 55 . 00 to Km 106 . 52 And Km 109 . 65 to Km . 137 . 08 Design length 78 . 95 Km in the state of AP2022 23 | INDIA | ANDHRA PRADESH | 10593100000 | Details | ||
5002115698 |
25-Oct-2023 | Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180 . 000 to Km 230 . 957 of NH116A (Package 5) in the state of West Bengal under HAM Mode . ||||Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180 . 000 to Km 230 . 957 of NH116A (Package 5) in the state of West Bengal under HAM Mode . | INDIA | DELHI (U.T.-NCT) | 12269100000 | Details | ||
5002129216 |
Not Specified | Introduction of Four sets (Two Low Height and Two Standard Height) Continuous Miner Packages with associated equipments , for winning coal without blasting in Katkona RO UG Mine of BKP Area of SECL on hiring basis and details as per BoQ and NIT . ||||Introduction of Four sets (Two Low Height and Two Standard Height) Continuous Miner Packages with associated equipments , for winning coal without blasting in Katkona RO UG Mine of BKP Area of SECL on hiring basis and details as per BoQ and NIT . | INDIA | CHHATTISGARH | 14967471168 | Details | ||
5002115679 |
25-Oct-2023 | Development of 4 lane EC from Chandrakona Ghatal Road Crossing to Bowaichandi sec Km41 . 000 to Km89 . 814 of NH 116A (Package2)in the state of West Bengal under HAM Mode||||Development of 4 lane EC from Chandrakona Ghatal Road Crossing to Bowaichandi sec Km41 . 000 to Km89 . 814 of NH 116A (Package2)in the state of West Bengal under HAM Mode | INDIA | DELHI (U.T.-NCT) | 15032900000 | Details |
Back |
Page 53 of 69 ( 684 records ) |
Next |
.... 48 49 50 51 52 53 54 55 56 57 58 .... |